Close
Search
Contents
Settings
Open figures and tables in new tab
Reduce font size
Increase font size
Maximise figure pane
Read aloud mode
Landing Page
1. Introduction
1.1. Purpose
1.2. Project Background
1.3. Scope
1.4. Consent Conditions
1.5. Document Revision
2. Summary of Designed-In Measures, Mitigation and Monitoring Included in the Array EIA Report
3. Roles and Responsibilities
3.1. The Applicant
3.2. The Applicant Environmental Manager
3.3. The Environmental Clerk of Works
3.4. Marine Coordinator
3.5. Contractor and Subcontractor
3.6. Spill Response Contractor
3.7. Maritime and Coastguard Agency
4. Potential Spill Sources and Control Measures
4.1. Potential Spill Sources and Control Measures
4.2. Pollution Sources and Risk Assessment
4.2.1. Tier Classification
4.2.2. Array Potential Spill Scenarios and Control Measures
5. Response Procedures and Checklists
5.1. Pollution Incident Response Procedure
5.1.1. Introduction
5.1.2. Spills Originating from a Vessel – Response and Notification Overview
5.1.3. Spills Originating from an Installation Associated with the Array – Response and Notification Overview
5.1.4. Spills within a Port
5.2. Reporting Requirements
5.2.1. Statutory Reporting Requirements
5.2.2. Response Checklists
5.3. Response Strategies
5.3.1. Response Strategies for Tier 1 Incidents
5.3.2. Response Strategies for Tier 2/3 Incidents
6. Spill Risk Proforma
7. Spill Assessment Checklist
8. Pollution Incident Log Sheet
9. Contacts Directory
10. References
Privacy notice
|
Cookies notice
back
Previous part
Next part
facc4a8796626d797b1f44435d5fd25b
8. Pollution Incident Log Sheet
An incident log must be completed by all personnel involved in the spill response.
Name:
Team:
Role:
Location:
Date/Time:
Communication/Action Taken/Notes
Previous part
Next part
Figures ▼
Figure 1.1
Location of the Array
Figure 4.1
Tier Definition (based on MMO, 2020)
Figure 5.1
Reporting Requirements for any Potential Spills at the Array
Figure 5.2
Protected Areas in the Vicinity of the Array
Tables ▼
Table 1.1
Consent Conditions to be Discharged by this MPCP
Table 2.1
Mitigation Measures Relevant to the MPCP
Table 4.1
Potential Spill Scenarios and Control Measures for the Array
Table 5.1
Spill Observer
Table 5.2
Applicant Environmental Manager or Vessel Master
Table 5.3
Marine Coordinator
Table 5.4
Harbour Master