6.2. Operation and Maintenance
6.2.1. Ossian Impact
- Based on the estimated annual expenditure for Ossian as a whole, the technical expert’s model of costs and the information provided in the SCDS it was assumed that under PDE Option 3 the annual operation and maintenance expenditure could be £247 million, of which £76 million (31%) could be secured in Scotland and £219 million in the UK (89%). This is shown in Table 6.10.
Table 6.10: PDE Option 3: Ossian Operation and Maintenance Spending by Category, Scotland and the UK
Parameters | Scotland | UK (Inc. Scotland) | Total (Scotland, rUK and rWorld) |
---|---|---|---|
Operational Training | £4 m | £4 m | £5 m |
Operational Onshore Logistics | £2 m | £2 m | £3 m |
Operational Offshore Logistics | £9 m | £13 m | £13 m |
Health and Safety Inspections | £1 m | £1 m | £1 m |
Seabed Lease | £17 m | £17 m | £17 m |
TNUoS Charges | £0 m | £106 m | £106 m |
Operational Insurance | £0 m | £12 m | £12 m |
Operations Centre and Support Staff | £14 m | £18 m | £18 m |
Wind Turbine Maintenance and Service | £16 m | £23 m | £47 m |
Balance of Plant Maintenance and Service | £11 m | £18 m | £21 m |
Maintenance Vessels | £2 m | £4 m | £4 m |
Maintenance Port | £1 m | £1 m | £1 m |
Total | £76 m | £219 m | £247 m |
Total (%) | 31% | 89% | 100% |
- Applying turnover per employee and turnover/GVA ratios for the relevant sectors it was estimated that Array’s direct annual economic impact could be £29 million GVA and 350 jobs in Scotland, and £64 million GVA and 600 years of employment in the UK (Table 6.11).
Table 6.11: PDE Option 3: Ossian Operation and Maintenance Direct Economic Impact, Scotland and the UK
Parameters | Scotland | UK | ||
---|---|---|---|---|
| GVA | Jobs | GVA | Jobs |
Operational Training | £2 m | 40 | £2 m | 40 |
Operational Onshore Logistics | £1 m | 10 | £1 m | 10 |
Operational Offshore Logistics | £2 m | 20 | £3 m | 30 |
Health and Safety Inspections | <£1 m | 0 | <£1 m | 0 |
Seabed Lease | £10 m | 100 | £10 m | 100 |
TNUoS Charges | £0 m | 0 | £22 m | 110 |
Operational Insurance | £0 m | 0 | £4 m | 20 |
Operations Centre and Support Staff | £3 m | 30 | £4 m | 40 |
Wind Turbine Maintenance and Service | £5 m | 60 | £7 m | 80 |
Balance of Plant Maintenance and Service | £4 m | 70 | £8 m | 120 |
Maintenance Vessels | £1 m | 10 | £2 m | 30 |
Maintenance Port | <£1 m | 0 | <£1 m | 0 |
Total | £29 m | 350 | £64 m | 600 |
- Applying GVA and employment multipliers it was therefore estimated that the Array’s annual economic impact could be £49 million GVA and 570 jobs in Scotland, and £195 million GVA and 1,670 years of employment in the UK (Table 6.12) (Table 6.13).
Table 6.12: PDE Option 3: Ossian Operation and Maintenance GVA impact, Scotland and the UK
Parameters | Scotland | UK |
---|---|---|
Direct GVA | £29 m | £64 m |
Indirect GVA | £11 m | £85 m |
Induced GVA | £8 m | £46 m |
Total GVA | £49 m | £195 m |
Table 6.13: PDE Option 3: Ossian Operation and Maintenance Employment impact, Scotland and the UK
Parameters | Scotland | UK |
---|---|---|
Direct Employment | 350 | 600 |
Indirect Employment | 160 | 810 |
Induced Employment | 60 | 260 |
Total Employment | 570 | 1,670 |
6.2.2. Array Impact
- For the Array it was estimated that the annual spend could be £247 million, of which £73 million (30%) could be secured in Scotland and £214 million (87%) could be secured in the UK (Table 6.14).
Table 6.14: PDE Option 3: Array Operation and Maintenance Spending by Category, Scotland and the UK
Parameters | Scotland | UK (Inc. Scotland) | Total (Scotland, rUK and rWorld) |
---|---|---|---|
Operational Training | £4 m | £4 m | £5 m |
Operational Onshore Logistics | £2 m | £2 m | £3 m |
Operational Offshore Logistics | £8 m | £12 m | £13 m |
Health and Safety Inspections | £1 m | £1 m | £1 m |
Seabed Lease | £17 m | £17 m | £17 m |
TNUoS Charges | £0 m | £106 m | £106 m |
Operational Insurance | £0 m | £11 m | £12 m |
Operations Centre and Support Staff | £12 m | £16 m | £18 m |
Wind Turbine Maintenance and Service | £16 m | £23 m | £47 m |
Balance of Plant Maintenance and Service | £11 m | £18 m | £21 m |
Maintenance Vessels | £2 m | £3 m | £4 m |
Maintenance Port | £1 m | £1 m | £1 m |
Total | £73 m | £214 m | £247 m |
Total (%) | 30% | 87% | 100% |
- Applying turnover per employee and turnover/GVA ratios for the relevant sectors it was estimated that the Array’s direct annual economic impact could be £28 million GVA and 350 jobs in Scotland, and £63 million GVA and 590 years of employment in the UK (Table 6.15).
Table 6.15: PDE Option 3: Array Operation and Maintenance Direct Economic Impact, Scotland and the UK
Parameters | Scotland | UK | ||
---|---|---|---|---|
| GVA | Jobs | GVA | Jobs |
Operational Training | £2 m | 40 | £2 m | 40 |
Operational Onshore Logistics | £1 m | 10 | £1 m | 10 |
Operational Offshore Logistics | £2 m | 20 | £3 m | 30 |
Health and Safety Inspections | <£1 m | 0 | <£1 m | 0 |
Seabed Lease | £10 m | 100 | £10 m | 100 |
TNUoS Charges | £0 m | 0 | £22 m | 110 |
Operational Insurance | £0 m | 0 | £4 m | 10 |
Operations Centre and Support Staff | £3 m | 30 | £3 m | 40 |
Wind Turbine Maintenance and Service | £5 m | 60 | £7 m | 80 |
Balance of Plant Maintenance and Service | £4 m | 70 | £8 m | 120 |
Maintenance Vessels | £1 m | 10 | £2 m | 20 |
Maintenance Port | <£1 m | 0 | <£1 m | 0 |
Total | £28 m | 350 | £63 m | 590 |
- Applying GVA and employment multipliers it was therefore estimated that the Array’s annual economic impact could be £48 million GVA and 560 jobs in Scotland, and £191 million GVA and 1,650 years of employment in the UK (Table 6.16) (Table 6.17).
Table 6.16: PDE Option 3: Array Operation and Maintenance GVA impact, Scotland and the UK
Parameters | Scotland | UK |
---|---|---|
Direct GVA | £28 m | £63 m |
Indirect GVA | £11 m | £84 m |
Induced GVA | £8 m | £45 m |
Total GVA | £48 m | £191 m |
Table 6.17: PDE Option 3: Array Operation and Maintenance Employment impact, Scotland and the UK
Parameters | Scotland | UK |
---|---|---|
Direct Employment | 350 | 590 |
Indirect Employment | 150 | 800 |
Induced Employment | 60 | 260 |
Total Employment | 560 | 1,650 |
- The spend at the primary operation and maintenance port(s) is expected to be around £25 million, directly employing 80 people (Table 6.18).
Table 6.18: PDE Option 3: Array Operation and Maintenance Port Impact by Category
Parameters | Total Investment | Port Spend | Employment |
---|---|---|---|
Operational Offshore Logistics | £13 m | £6 m | 20 |
Operations Centre and Support Staff | £18 m | £12 m | 30 |
Wind Turbine Maintenance and Service | £47 m | £5 m | 20 |
Balance of Plant Maintenance and Service | £21 m | £2 m | 10 |
Maintenance Port | £1 m | £1 m | 0 |
Total | £100 m | £25 m | 80 |