5.2. Operation and Maintenance
5.2.1. Ossian Impact
- Based on the estimated annual expenditure for Ossian as a whole, the technical expert’s model of costs and the information provided in the SCDS it was assumed that under PDE Option 2 the annual operation and maintenance expenditure could be £259 million, of which £80 million (31%) could be secured in Scotland and £226 million in the UK (87%). This is shown in Table 5.10.
Table 5.10: PDE Option 2: Ossian Operation and Maintenance Spending by Category, Scotland and the UK
Parameters | Scotland | UK (Inc. Scotland) | Total (Scotland, rUK and rWorld) |
---|---|---|---|
Operational Training | £4 m | £4 m | £5 m |
Operational Onshore Logistics | £2 m | £2 m | £3 m |
Operational Offshore Logistics | £9 m | £13 m | £13 m |
Health and Safety Inspections | £1 m | £1 m | £1 m |
Seabed Lease | £17 m | £17 m | £17 m |
TNUoS Charges | £0 m | £106 m | £106 m |
Operational Insurance | £0 m | £12 m | £12 m |
Operations Centre and Support Staff | £14 m | £18 m | £18 m |
Wind Turbine Maintenance and Service | £19 m | £27 m | £55 m |
Balance of Plant Maintenance and Service | £12 m | £20 m | £24 m |
Maintenance Vessels | £2 m | £4 m | £4 m |
Maintenance Port | £1 m | £1 m | £1 m |
Total | £80 m | £226 m | £259 m |
Total (%) | 31% | 87% | 100% |
- Applying turnover per employee and turnover/GVA ratios for the relevant sectors it was estimated that Ossian’s direct annual economic impact could be £31 million GVA and 370 jobs in Scotland, and £67 million GVA and 630 years of employment in the UK (Table 5.11).
Table 5.11: PDE Option 2: Ossian Operation and Maintenance Direct Economic Impact, Scotland and the UK
Parameters | Scotland | UK | ||
---|---|---|---|---|
| GVA | Jobs | GVA | Jobs |
Operational Training | £2 m | 40 | £2 m | 40 |
Operational Onshore Logistics | £1 m | 10 | £1 m | 10 |
Operational Offshore Logistics | £2 m | 20 | £3 m | 30 |
Health and Safety Inspections | <£1 m | 0 | <£1 m | 0 |
Seabed Lease | £10 m | 100 | £10 m | 100 |
TNUoS Charges | £0 m | 0 | £22 m | 110 |
Operational Insurance | £0 m | 0 | £5 m | 20 |
Operations Centre and Support Staff | £3 m | 30 | £4 m | 40 |
Wind Turbine Maintenance and Service | £6 m | 70 | £8 m | 100 |
Balance of Plant Maintenance and Service | £5 m | 80 | £9 m | 140 |
Maintenance Vessels | £1 m | 20 | £2 m | 30 |
Maintenance Port | <£1 m | 10 | <£1 m | 10 |
Total | £31 m | 370 | £67 m | 630 |
- Applying GVA and employment multipliers it was therefore estimated that Ossian’s annual economic impact could be £51 million GVA and 610 jobs in Scotland, and £202 million GVA and 1,770 years of employment in the UK (Table 5.12; Table 5.13).
Table 5.12: PDE Option 2: Ossian Operation and Maintenance GVA impact, Scotland and the UK
Parameters | Scotland | UK |
---|---|---|
Direct GVA | £31 m | £67 m |
Indirect GVA | £12 m | £87 m |
Induced GVA | £9 m | £48 m |
Total GVA | £51 m | £202 m |
Table 5.13: PDE Option 2: Ossian Operation and Maintenance Employment impact, Scotland and the UK
Parameters | Scotland | UK |
---|---|---|
Direct Employment | 370 | 630 |
Indirect Employment | 170 | 850 |
Induced Employment | 70 | 290 |
Total Employment | 610 | 1,770 |
5.2.2. Array Impact
- For the Array it was estimated that the annual spend could be £259 million, of which £78 million (30%) could be secured in Scotland and £221 million (86%) could be secured in the UK (Table 5.14).
Table 5.14: PDE Option 2: Array Operation and Maintenance Spending by Category, Scotland and the UK
Parameters | Scotland | UK (Inc. Scotland) | Total (Scotland, rUK and rWorld) |
---|---|---|---|
Operational Training | £4 m | £4 m | £5 m |
Operational Onshore Logistics | £2 m | £2 m | £3 m |
Operational Offshore Logistics | £8 m | £12 m | £13 m |
Health and Safety Inspections | £1 m | £1 m | £1 m |
Seabed Lease | £17 m | £17 m | £17 m |
TNUoS Charges | £0 m | £106 m | £106 m |
Operational Insurance | £0 m | £11 m | £12 m |
Operations Centre and Support Staff | £12 m | £16 m | £18 m |
Wind Turbine Maintenance and Service | £19 m | £27 m | £55 m |
Balance of Plant Maintenance and Service | £12 m | £20 m | £24 m |
Maintenance Vessels | £2 m | £4 m | £4 m |
Maintenance Port | £1 m | £1 m | £1 m |
Total | £78 m | £221 m | £259 m |
Total (%) | 30% | 86% | 100% |
- Applying turnover per employee and turnover/GVA ratios for the relevant sectors it was estimated that the Array’s direct annual economic impact could be £30 million GVA and 370 jobs in Scotland, and £65 million GVA and 620 years of employment in the UK (Table 5.15).
Table 5.15: PDE Option 2: Array Operation and Maintenance Direct Economic Impact, Scotland and the UK
Parameters | Scotland | UK | ||
---|---|---|---|---|
| GVA | Jobs | GVA | Jobs |
Operational Training | £2 m | 40 | £2 m | 40 |
Operational Onshore Logistics | £1 m | 10 | £1 m | 10 |
Operational Offshore Logistics | £2 m | 20 | £3 m | 30 |
Health and Safety Inspections | <£1 m | 0 | <£1 m | 0 |
Seabed Lease | £10 m | 100 | £10 m | 100 |
TNUoS Charges | £0 m | 0 | £22 m | 110 |
Operational Insurance | £0 m | 0 | £4 m | 20 |
Operations Centre and Support Staff | £3 m | 30 | £3 m | 40 |
Wind Turbine Maintenance and Service | £6 m | 70 | £8 m | 100 |
Balance of Plant Maintenance and Service | £5 m | 80 | £9 m | 140 |
Maintenance Vessels | £1 m | 10 | £2 m | 30 |
Maintenance Port | <£1 m | 10 | <£1 m | 10 |
Total | £30 m | 370 | £65 m | 620 |
- Applying GVA and employment multipliers it was therefore estimated that the Array’s annual economic impact could be £50 million GVA and 590 jobs in Scotland, and £198 million GVA and 1,740 years of employment in the UK (Table 5.16; Table 5.17).
Table 5.16: PDE Option 2: Array Operation and Maintenance GVA impact, Scotland and the UK
Parameters | Scotland | UK |
---|---|---|
Direct GVA | £30 m | £65 m |
Indirect GVA | £12 m | £86 m |
Induced GVA | £9 m | £46 m |
Total GVA | £50 m | £198 m |
Table 5.17: PDE Option 2: Array Operation and Maintenance Employment impact, Scotland and the UK
Parameters | Scotland | UK |
---|---|---|
Direct Employment | 370 | 620 |
Indirect Employment | 160 | 840 |
Induced Employment | 70 | 280 |
Total Employment | 590 | 1,740 |
- The spend at the primary operation and maintenance port(s) is expected to be around £27 million, directly employing 100 people (Table 5.18).
Table 5.18: PDE Option 2: Ossian Operation and Maintenance Port Impact by Category
Parameters | Total Investment | Port Spend | Employment |
---|---|---|---|
Operational Offshore Logistics | £13 m | £6 m | 20 |
Operations Centre and Support Staff | £18 m | £12 m | 30 |
Wind Turbine Maintenance and Service | £55 m | £5 m | 20 |
Balance of Plant Maintenance and Service | £24 m | £2 m | 20 |
Maintenance Port | £1 m | £1 m | 10 |
Total | £111 m | £27 m | 100 |