4.2. Operation and Maintenance

4.2.1. Ossian Impact

  1. Based on the estimated annual expenditure for Ossian as a whole, the technical expert’s model of costs and the information provided in the SCDS it was assumed that under PDE Option 1 the annual operation and maintenance expenditure could be £276 million, of which £87 million (31%) could be secured in Scotland and £237 million in the UK (86%) as shown in Table 4.10.

Table 4.10: PDE Option 1: Ossian Operation and Maintenance Spending by Category, Scotland and the UK

Parameters

Scotland

UK (Inc. Scotland)

Total (Scotland, rUK and rWorld)

Operational Training

 £4 m

 £4 m

 £5 m

Operational Onshore Logistics

 £2 m

 £2 m

 £3 m

Operational Offshore Logistics

 £9 m

 £13 m

 £13 m

Health and Safety Inspections

 £1 m

 £1 m

 £1 m

Seabed Lease

 £17 m

 £17 m

 £17 m

TNUoS Charges

 £0 m

 £106 m

 £106 m

Operational Insurance

 £0 m

 £13 m

 £13 m

Operations Centre and Support Staff

 £14 m

 £18 m

 £18 m

Wind Turbine Maintenance and Service

 £23 m

 £33 m

 £67 m

Balance of Plant Maintenance and Service

 £14 m

 £24 m

 £28 m

Maintenance Vessels

 £2 m

 £5 m

 £5 m

Maintenance Port

 £1 m

 £1 m

 £1 m

Total

 £87 m

 £237 m

 £276 m

Percentage of total expenditure (%)

31%

86%

100%

 

  1. Applying turnover per employee and turnover/GVA ratios for the relevant sectors it was estimated that Ossian’s direct annual economic impact could be £33 million GVA and 410 jobs in Scotland, and £71 million GVA and 680 jobs in the UK (Table 4.11).

 

Table 4.11: PDE Option 1: Ossian Operation and Maintenance Direct Economic Impact, Scotland and the UK

Parameters

Scotland

UK

 

GVA

Jobs

GVA

Jobs

Operational Training

 £2 m

 40

 £2 m

 40

Operational Onshore Logistics

 £1 m

 10

 £1 m

 10

Operational Offshore Logistics

 £2 m

 20

 £3 m

 30

Health and Safety Inspections

 <£1 m

 0

 <£1 m

 0

Seabed Lease

 £10 m

 100

 £10 m

 100

TNUoS Charges

 £0 m

 0

 £22 m

 110

Operational Insurance

 £0 m

 0

 £5 m

 20

Operations Centre and Support Staff

 £3 m

 30

 £4 m

 40

Wind Turbine Maintenance and Service

 £7 m

 80

 £10 m

 120

Balance of Plant Maintenance and Service

 £6 m

 100

 £10 m

 160

Maintenance Vessels

 £1 m

 20

 £3 m

 40

Maintenance Port

 <£1 m

 10

 <£1 m

 10

Total

 £33 m

 410

 £71 m

 680

 

  1. Applying GVA and employment multipliers it was therefore estimated that Ossian’s annual economic impact could be £55 million GVA and 660 jobs in Scotland, and £212 million GVA and 1,910 jobs in the UK (Table 4.12) (Table 4.13).

 

Table 4.12: PDE Option 1: Ossian Operation and Maintenance GVA impact, Scotland and the UK

Parameters

Scotland

UK

Direct GVA

 £33 m

 £71 m

Indirect GVA

 £13 m

 £91 m

Induced GVA

 £10 m

 £51 m

Total GVA

 £55 m

 £212 m

 

Table 4.13: PDE Option 1: Ossian Operation and Maintenance Employment impact, Scotland and the UK

Parameters

Scotland

UK

Direct Employment

 410

 680

Indirect Employment

 180

 900

Induced Employment

 80

 330

Total Employment

 660

 1,910

 

4.2.2. Array Impact

  1. For the Array it was estimated that the annual spend could be £276 million, of which £84 million (30%) could be secured in Scotland and £232 million (84%) could be secured in the UK (Table 4.14).

 

Table 4.14: PDE Option 1: Array Operation and Maintenance Spending by Category, Scotland and the UK

Parameters

Scotland

UK (Inc. Scotland)

Total (Scotland, rUK and rWorld)

Operational Training

 £4 m

 £4 m

 £5 m

Operational Onshore Logistics

 £2 m

 £2 m

 £3 m

Operational Offshore Logistics

 £8 m

 £12 m

 £13 m

Health and Safety Inspections

 £1 m

 £1 m

 £1 m

Seabed Lease

 £17 m

 £17 m

 £17 m

TNUoS Charges

 £0 m

 £106 m

 £106 m

Operational Insurance

 £0 m

 £12 m

 £13 m

Operations Centre and Support Staff

 £12 m

 £16 m

 £18 m

Wind Turbine Maintenance and Service

 £23 m

 £33 m

 £67 m

Balance of Plant Maintenance and Service

 £14 m

 £24 m

 £28 m

Maintenance Vessels

 £2 m

 £4 m

 £5 m

Maintenance Port

 £1 m

 £1 m

 £1 m

Total

 £84 m

 £232 m

 £276 m

Percentage of total expenditure (%)

30%

84%

100%

 

  1. Applying turnover per employee and turnover/GVA ratios for the relevant sectors it was estimated that the Array’s direct annual economic impact could be £32 million GVA and 400 jobs in Scotland, and £69 million GVA and 670 jobs in the UK (Table 4.15).

 

Table 4.15: PDE Option 4: Array Operation and Maintenance Direct Economic Impact, Scotland and the UK

Parameters

Scotland

UK

 

GVA

Jobs

GVA

Jobs

Operational Training

 £2 m

 40

 £2 m

 40

Operational Onshore Logistics

 £1 m

 10

 £1 m

 10

Operational Offshore Logistics

 £2 m

 20

 £3 m

 30

Health and Safety Inspections

 <£1 m

 0

 <£1 m

 0

Seabed Lease

 £10 m

 100

 £10 m

 100

TNUoS Charges

 £0 m

 0

 £22 m

 110

Operational Insurance

 £0 m

 0

 £4 m

 20

Operations Centre and Support Staff

 £3 m

 30

 £3 m

 40

Wind Turbine Maintenance and Service

 £7 m

 80

 £10 m

 120

Balance of Plant Maintenance and Service

 £6 m

 100

 £10 m

 160

Maintenance Vessels

 £1 m

 20

 £2 m

 30

Maintenance Port

 <£1 m

 10

 <£1 m

 10

Total

 £32 m

 400

 £69 m

 670

 

  1. Applying GVA and employment multipliers it was therefore estimated that the Array’s annual economic impact could be £54 million GVA and 650 jobs in Scotland, and £208 million GVA and 1,880 jobs in the UK (Table 4.16) (Table 4.17).

 

Table 4.16: PDE Option 1: Array Operation and Maintenance GVA impact, Scotland and the UK

Parameters

Scotland

UK

Direct GVA

 £32 m

 £69 m

Indirect GVA

 £13 m

 £90 m

Induced GVA

 £9 m

 £49 m

Total GVA

 £54 m

 £208 m

 

Table 4.17: PDE Option 1: Array Operation and Maintenance Employment impact, Scotland and the UK

Parameters

Scotland

UK

Direct Employment

 400

 670

Indirect Employment

 180

 890

Induced Employment

 70

 320

Total Employment

 650

 1,880

 

  1. The spend at the primary operation and maintenance port(s) is expected to be around £28 million, directly employing 100 people (Table 4.18).

 

Table 4.18: PDE Option 1: Array Operation and Maintenance Port Impact by Category

Parameters

Total Investment

Port Spend

Employment

Operational Offshore Logistics

 £13 m

 £6 m

20

Operations Centre and Support Staff

 £18 m

 £12 m

30

Wind Turbine Maintenance and Service

 £67 m

 £7 m

20

Balance of Plant Maintenance and Service

 £28 m

 £3 m

20

Maintenance Port

 £1 m

 £1 m

10

Total

 £126 m

 £28 m

100