7.2. Operation and Maintenance
7.2.1. Ossian Impact
- Based on the estimated annual expenditure for Ossian as a whole, the technical expert’s model of costs and the information provided in the SCDS it was assumed that under PDE Option 4 the annual operation and maintenance expenditure could be £227 million, of which £68 million (30%) could be secured in Scotland and £207 million in the UK (91%). This is shown in Table 7.10.
Table 7.10: PDE Option 4: Ossian Operation and Maintenance Spending by Category, Scotland and the UK
Parameters | Scotland | UK (Inc. Scotland) | Total (Scotland, rUK and rWorld) |
---|---|---|---|
Operational Training | £4 m | £4 m | £5 m |
Operational Onshore Logistics | £2 m | £2 m | £3 m |
Operational Offshore Logistics | £9 m | £13 m | £13 m |
Health and Safety Inspections | £1 m | £1 m | £1 m |
Seabed Lease | £17 m | £17 m | £17 m |
TNUoS Charges | £0 m | £106 m | £106 m |
Operational Insurance | £0 m | £12 m | £12 m |
Operations Centre and Support Staff | £14 m | £18 m | £18 m |
Wind Turbine Maintenance and Service | £11 m | £16 m | £33 m |
Balance of Plant Maintenance and Service | £8 m | £14 m | £17 m |
Maintenance Vessels | £1 m | £3 m | £3 m |
Maintenance Port | £1 m | £1 m | £1 m |
Total | £68 m | £207 m | £227 m |
Total (%) | 30% | 91% | 100% |
- Applying GVA and employment ratios it was therefore estimated that the Array’s direct annual economic could be £26 million GVA and 320 jobs in Scotland, and £60 million GVA and 540 years of employment in the UK (Table 7.11).
Table 7.11: PDE Option 4: Ossian Operation and Maintenance Direct Economic Impact, Scotland and the UK
Parameters | Scotland | UK | ||
---|---|---|---|---|
| GVA | Jobs | GVA | Jobs |
Operational Training | £2 m | 40 | £2 m | 40 |
Operational Onshore Logistics | £1 m | 10 | £1 m | 10 |
Operational Offshore Logistics | £2 m | 20 | £3 m | 30 |
Health and Safety Inspections | <£1 m | 0 | <£1 m | 0 |
Seabed Lease | £10 m | 100 | £10 m | 100 |
TNUoS Charges | £0 m | 0 | £22 m | 110 |
Operational Insurance | £0 m | 0 | £4 m | 20 |
Operations Centre and Support Staff | £3 m | 30 | £4 m | 40 |
Wind Turbine Maintenance and Service | £3 m | 40 | £5 m | 60 |
Balance of Plant Maintenance and Service | £4 m | 60 | £6 m | 100 |
Maintenance Vessels | £1 m | 10 | £2 m | 20 |
Maintenance Port | <£1 m | 0 | <£1 m | 0 |
Total | £26 m | 320 | £60 m | 540 |
- Applying GVA and employment multipliers it was therefore estimated that the Array’s annual economic impact could be £44 million GVA and 500 jobs in Scotland, and £183 million GVA and 1,510 years of employment in the UK(Table 7.12; Table 7.13).
Table 7.12: PDE Option 4: Ossian Operation and Maintenance GVA impact, Scotland and the UK
Parameters | Scotland | UK |
---|---|---|
Direct GVA | £26 m | £60 m |
Indirect GVA | £10 m | £81 m |
Induced GVA | £8 m | £42 m |
Total GVA | £44 m | £183 m |
Table 7.13: PDE Option 4: Ossian Operation and Maintenance Employment impact, Scotland and the UK
Parameters | Scotland | UK |
---|---|---|
Direct Employment | 320 | 540 |
Indirect Employment | 140 | 750 |
Induced Employment | 50 | 220 |
Total Employment | 500 | 1,510 |
7.2.2. Array Impact
- For the Array it was estimated that the annual spend could be £227 million, of which £65 million (29%) could be secured in Scotland and £202 million (89%) could be secured in the UK (Table 7.14).
Table 7.14: PDE Option 4: Array Operation and Maintenance Spending by Category, Scotland and the UK
Parameters | Scotland | UK (Inc. Scotland) | Total (Scotland, rUK and rWorld) |
---|---|---|---|
Operational Training | £4 m | £4 m | £5 m |
Operational Onshore Logistics | £2 m | £2 m | £3 m |
Operational Offshore Logistics | £8 m | £12 m | £13 m |
Health and Safety Inspections | £1 m | £1 m | £1 m |
Seabed Lease | £17 m | £17 m | £17 m |
TNUoS Charges | £0 m | £106 m | £106 m |
Operational Insurance | £0 m | £11 m | £12 m |
Operations Centre and Support Staff | £12 m | £16 m | £18 m |
Wind Turbine Maintenance and Service | £11 m | £16 m | £33 m |
Balance of Plant Maintenance and Service | £8 m | £14 m | £17 m |
Maintenance Vessels | £1 m | £3 m | £3 m |
Maintenance Port | <£1 m | <£1 m | £1 m |
Total | £65 m | £202 m | £227 m |
Total (%) | 29% | 89% | 100% |
- Applying turnover per employee and turnover/GVA ratios for the relevant sectors it was estimated that the Array’s direct annual economic impact could be £26 million GVA and 310 jobs in Scotland, and £58 million GVA and 530 years of employment in the UK (Table 7.15).
Table 7.15: PDE Option 4: Array Operation and Maintenance Direct Economic Impact, Scotland and the UK
Parameters | Scotland | UK | ||
---|---|---|---|---|
| GVA | Jobs | GVA | Jobs |
Operational Training | £2 m | 40 | £2 m | 40 |
Operational Onshore Logistics | £1 m | 10 | £1 m | 10 |
Operational Offshore Logistics | £2 m | 20 | £3 m | 30 |
Health and Safety Inspections | <£1 m | 0 | <£1 m | 0 |
Seabed Lease | £10 m | 100 | £10 m | 100 |
TNUoS Charges | £0 m | 0 | £22 m | 110 |
Operational Insurance | £0 m | 0 | £4 m | 10 |
Operations Centre and Support Staff | £3 m | 30 | £3 m | 40 |
Wind Turbine Maintenance and Service | £3 m | 40 | £5 m | 60 |
Balance of Plant Maintenance and Service | £4 m | 60 | £6 m | 100 |
Maintenance Vessels | £1 m | 10 | £1 m | 20 |
Maintenance Port | <£1 m | 0 | <£1 m | 0 |
Total | £26 m | 310 | £58 m | 530 |
- Applying GVA and employment multipliers it was therefore estimated that the Array’s annual economic impact could be £43 million GVA and 490 jobs in Scotland, and £179 million GVA and 1,480 years of employment in the UK (Table 7.16; Table 7.17).
Table 7.16: PDE Option 4: Array Operation and Maintenance GVA impact, Scotland and the UK
Parameters | Scotland | UK |
---|---|---|
Direct GVA | £26 m | £58 m |
Indirect GVA | £10 m | £80 m |
Induced GVA | £7 m | £41 m |
Total GVA | £43 m | £179 m |
Table 7.17: PDE Option 4: Array Operation and Maintenance Employment impact, Scotland and the UK
Parameters | Scotland | UK |
---|---|---|
Direct Employment | 310 | 530 |
Indirect Employment | 130 | 750 |
Induced Employment | 50 | 210 |
Total Employment | 490 | 1,480 |
- The spend at the primary operation and maintenance port(s) is expected to be around £23 million, directly employing 70 people (Table 7.18).
Table 7.18: PDE Option 4: Array Operation and Maintenance Port Impact by Category
Parameters | Total Investment | Port Spend | Employment |
---|---|---|---|
Operational Offshore Logistics | £13 m | £6 m | 20 |
Operations Centre and Support Staff | £18 m | £12 m | 30 |
Wind Turbine Maintenance and Service | £33 m | £3 m | 10 |
Balance of Plant Maintenance and Service | £17 m | £2 m | 10 |
Maintenance Port | £1 m | <£1 m | 0 |
Total | £81 m | £23 m | 70 |